- Replace window.location.reload() with router.refresh() in ScheduleGenerator, MatchEditor, RecalculateEloButton for proper Next.js cache invalidation
- Add revalidatePath() call after schedule generation in POST handler
- Add ownerId to tournament creation in cucumber tests for proper permission checks
- Assign tournament_admin role via Prisma after user creation in cucumber tests
- Fix TypeScript type annotations in hooks.ts (tournament id map)
- Update page reload to use networkidle in common-steps.ts
- Clear .next/ cache before cucumber tests in justfile
- Add .turbo to clean target
- Add comprehensive debug logging to schedule API route
- Document findings in docs/TROUBLESHOOTING_SCHEDULE_GENERATION.md
## Summary
This PR implements the tournament schedule tab functionality and fixes all remaining E2E test failures.
### Changes Included
1. **Tournament Schedule Feature**
- Added tournament schedule page at `/admin/tournaments/[id]/schedule`
- Implemented "Generate Schedule" button functionality
- Added schedule generation logic for round-robin tournaments
2. **E2E Test Fixes**
- Fixed database connection issues in production builds
- Improved test reliability with better error handling and debugging
- Updated test infrastructure to use environment variables instead of hardcoded values
3. **CI/CD Updates**
- Added E2E test job to PR workflow
- Configured tests to run against development database
- Moved database password to Gitea secrets
4. **Code Quality**
- Removed hardcoded passwords from codebase
- Improved Prisma client configuration
- Enhanced authentication and navigation components
### Test Results
All 16 E2E test scenarios are now passing:
- Authentication tests: ✅
- Registration tests: ✅
- Tournament schedule tests: ✅
- Player schedule tests: ✅
- Admin navigation tests: ✅
### Database Configuration
- Tests run against `euchre_camp_dev` database
- Production builds use environment variables for database configuration
- Database password stored in Gitea secrets as `DB_PASSWORD`
### CI Pipeline
The PR workflow now includes:
1. Unit tests
2. E2E tests (using production build)
3. Version bump analysis
E2E tests must pass before PR can be merged.
Reviewed-on: #27
Co-authored-by: David Gwilliam <dhgwilliam@gmail.com>
Co-committed-by: David Gwilliam <dhgwilliam@gmail.com>